Project Summary:
Project Abstract:
The asphalt paving industry is studying warm mix asphalt (WMA) technology as a method for reducing asphalt mixture placement temperature which could bring several cost, environmental, and performance benefits. This new technology presents several challenges to the current mixture design and construction process. The two goals of this project are to develop a mixture design and analysis method for WMA and to produce construction specifications for these mixtures to ensure adequate performance.
Researchers will first conduct a worldwide literature search and survey on WMA mixture design, construction, and performance. Laboratory characterization and field demonstration/evaluation experiments will then be designed and completed to assist in the development of a mixture design process and draft construction specifications. Based on analysis and evaluation of the test results and field evaluations, this project will produce a summary report and two research reports that document the information search, recommended mixture design and analysis method, and construction specifications.
Project Objectives:
To develop and recommend a mix design and analysis method for WMA and guidelines for construction.
Task Descriptions:
Task 1: Meet with TxDOT Project Personnel
Task 2: Conduct Information Search
Task 3: Develop Laboratory Experiment Design
Task 4: Conduct Laboratory Testing Plan
Task 5: Field Demonstration Projects
Task 6: Field Performance Evaluation
Task 7: Develop WMA Mixture Design and Analysis Method
Task 8: Develop Construction Specifications
Task 9: Meet with TxDOT Project Personnel
Task 10: Document Project Findings and Recommendations
Index Terms:
Asphalt Pavements, Asphalt Mixtures, Temperature, Cost Effectiveness, Environmental Impacts, Performance Evaluations, Technological Innovations, Mix Design, Research Projects